PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI DALAM PANDEMI COVID-19 PADA PROYEK PEMBANGUNAN STRUKTUR ATAS JEMBATAN PROGO TEMPURAN-SALAMAN
Abstract
The Covid-19 pandemic has spread around the world to have adverse effects on construction activities, one of which is construction safety. Construction Safety Management System (SMKK) is needed to reduce and avoid the risk of accidents on construction. Research is conducted to find out the factors that affect work, the application of construction safety management systems, and provide solutions to risk factors that occur. The method used in this study uses Job Safety Analysys (JSA). The result is 7 variables that affect smkk factors, variable factors that are very influential in the implementation of SMKK is cost with an average value of 100%. And there are 4 jobs with low, medium, high and extreme risk levels. The application of SMKK to existing factors by the company has been implemented very precisely. The recommendation of smkk implementation is done through interviews, observations, and literature studies.
Full Text:
PDFRefbacks
- There are currently no refbacks.
e-ISSN : 2747-1217