Proyeksi Kebutuhan Tenaga Listrik Kota dan Kabupaten Magelang Tahun 2030 Menggunakan Perangkat Lunak Long-range Energy Alternatives Planning system
Abstract
Full Text:
##Full Text##References
Ardian, Ricky. 2016. Peramalan Beban Listrik Jangka Panjang Provinsi D.I. Yogyakarta Menggunakan Neural Network Backpropagation. Surabaya: Universitas Negri Surabaya.
Ayuningtyas, Prita. dkk. 2016. Prediksi Beban Listrik Pada PT.PLN (Persero) Menggunakan Regresi Interval Dengan Neural Fuzzy. Jurnal Coding Sistem Komputer UNTAN Vol.04 No.1 ISSN:2338-493X
Badruzzaman, Yusnan. 2013. Roadmap Energy di Provinsi Daerah Istimewa Yogyakarta. ISSN: 2252-4908 Vol. 2 No. 1 April 2013 : 18 – 30
Deryanus. 2015. Ketersediaan Energi Listrik Sulawesi Utara Sampai Tahun 2020. Jurnal Teknik Elektro dan Komputer ISSN:2301-8402
Kavehnia, Z. dkk. 2007. Time-Series Load Modelling and Load Forecasting Using Neuro-Fuzzy Techniques, IEEE Electrical Power Quality and Utilisation.
Massarang, Maryantho. Dkk. 2014. Peramalan Beban Jangka Panjang Sistem Kelistrikan Kota Palu Menggunakan Metode Logika Fuzzy. Jurnal EECCIS Vol.8, No.2
Padmakumari, dkk. 2014. Application of Fuzzy System Theory In Land Used Based Long Term Distribution Load Forecasting. IEEE Catalogue No.98EX/197.
Putra, Chandra. 2014. Analisa Pertumbuhan Beban Terhadap Ketersediaan Energi Listrik di Sistem Kelistrikan Sulawesi Selatan. E-Journal Teknik Elektro dan Komputer (2014), ISSN : 2301-8402
Saeid, A. dkk, 2011. Short Term Load Forecasting Using Interval Type-2 Fuzzy Logic Systems. IEEE Fuzzy Systems
Sugiyono, Agus. 2006. Optimasi Penyediaan Energi Nasional: Konsep Dan Aplikasi Model Markal. Seminar Nasional Matematika, Statistika, dan Pendidikan Matematika. hal. 1-7.
Suhono. 2010. Perencanaan Permintaan dan Penyediaan Energi Listrk di Wilayah Kabupaten Sleman Menggunakan Perangkat Lunak LEAP. Skripsi Yogyakarta: Universitas Gadjah Mada.
Wijaya, M. E. & Limmeechokchai B. Optimization of Indonesian Geothermal Energy Resources for Future Clean Electricity Supply: A Case of Java-Madura-Bali System. The Conference on Energy Network of Thailand, General of the c-5 Naresuan University, 2-3.
Wijaya, M. E. 2009. Supply Security Improvement of Electricity Expansion Planning and CO2 Mitigation in Indonesia. Tesis, The Joint Graduate School of Energy And Environment at King Mongkut’s. University of Technology Thonburi, Thonburi.
Wilson, T. dkk. 2014. Long Term Probabilistic Load Forecasting and Normalization With Hourly Information, IEEE Transaction on Smart Grid 5 (1) 1949-3053.
Winkler, H. dkk. 2005 Cape Town Energy Futures: Policies and Scenarios for Sustainable City Energy Development. Energy Research Centre University of Cape Town, Cape Town.
Zhang, Y. dkk. 2007. The Fuzzy Logic Clustering Neural Network Approach for Middle and Long Term Load Forecasting. IEEE Grey System and Intelligent Service.
Kabupaten Magelang Dalam Angka 2013. Katalog BPS: 1102001.33.08, BPS Kabupaten Magelang, 2013.
Kabupaten Magelang Dalam Angka 2014. Katalog BPS: 1102001.33.08, BPS Kabupaten Magelang, 2014.
Kabupaten Magelang Dalam Angka 2016. Katalog BPS: 1102001.33.08, BPS Kabupaten Magelang, 2016.
Kota Magelang Dalam Angka 2013, Katalog BPS: 1102001.3371, BPS Kota Magelang, 2013.
Kota Magelang Dalam Angka 2014, Katalog BPS: 1102001.3371, BPS Kota Magelang, 2014.
Kota Magelang Dalam Angka 2015, Katalog BPS: 1102001.3371, BPS Kota Magelang, 2015.
Kota Magelang Dalam Angka 2016, Katalog BPS: 1102001.3371, BPS Kota Magelang, 2016.
Peraturan Daerah Kabupaten Magelang No. 5 Tahun 2011 Tentang Rencana Tata Ruang Wilayah Kabupaten Magelang Tahun 2010-2030
Peraturan Daerah Kota Magelang No. 4 Tahun 2012 Tentang Rencana Tata Ruang Wilayah Kota Magelang Tahun 2011-2031
UU RI No 30 tahun 2009 Tentang Ketenagalistrikan
UU RI No. 30 Tahun 2007 Tentang Energi
DOI: https://doi.org/10.31002/jeecit.v1i1.3074
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Universitas Tidar
e-ISSN : 2745-6412 p-ISSN : 2797-1740