|
Issue |
Title |
|
Vol 4, No 1 (2023) |
SISTEM PENGENDALIAN SUHU DAN KELEMBAPAN PADA KANDANG AYAM BROILER |
Abstract
PDF
|
Ahmad Fahrudin, Ibrahin Nawawi, Hery Teguh Setiawan |
|
Vol 1, No 2 (2020) |
SISTEM PENGHITUNG PULL UP OTOMATIS MENGGUNAKAN SENSOR ULTRASONIK BERBASIS ATMEGA16 |
Abstract
##Full Text##
|
Dimas Nov Arjuna, Ibrahim Nawawi, Ika Setyowati |
|
Vol 1, No 1 (2020) |
SISTEM PENTANAHAN SALURAN DISTRIBUSI 20 KV TERHADAP GANGGUAN SURJA PETIR |
Abstract
##Full Text##
|
Allan Indra Gunawan, Sapto Nisworo, Agung Trihasto |
|
Vol 3, No 1 (2022) |
SISTEM PRESENSI OTOMATIS MENGGUNAKAN SENSOR MLX90614 DAN RFID BERBASIS ARDUINO |
Abstract
PDF
|
Agus - oktiawan, Ibrahim Nawawi, Bagus Fatkhurrozi |
|
Vol 2, No 1 (2021) |
Stabilitas Transien Pada Generator Kapasitas 315 Mw Akibat Variasi Beban |
Abstract
##Full Text##
|
Dita Atma Nila Sari, Agung Trihasto, Deria Pravitasari |
|
Vol 4, No 2 (2023) |
Studi Kelayakan Penerapan Heterogen Network 5G di Kota Magelang |
Abstract
PDF
|
tatokman tatokman, Ika Setyowati, Bagus Fatkhurrozi |
|
Vol 2, No 2 (2021) |
Studi Pengendali PI pada Vienna Rectifier 3 Fasa untuk Fast Charging Stations (FCHARs) Kendaraan Listrik |
Abstract
##Full Text##
|
Wahyu Juliarto, Bagus Fatkhurrozi, Ibrahim Nawawi |
|
Vol 3, No 2 (2022) |
STUDI SISTEM PENTANAHAN PERALATAN DI GARDU INDUK: STUDI KASUS PADA GARDU INDUK TEMANGGUNG |
Details
PDF
|
alfian yusuf syarifudin, Sapto Nisworo, Agung Trihasto |
|
Vol 3, No 2 (2022) |
STUDI SISTEM PROTEKSI RELE PADA BAY TRAFO I KAPASITAS 30 MVA DI GARDU INDUK 150 kV TEMANGGUNG |
Abstract
PDF
|
Reza Wahyu Setyawan, Sapto Nisworo, Deria Pravitasari |
|
Vol 3, No 1 (2022) |
STUDI TRANSIEN MOTOR INDUKSI 3 FASA ROTOR SANGKAR KAPASITAS 2300V 700 HP PADA PT. PERTAMINA RU IV CILACAP |
Abstract
PDF
|
Busyairi Majid, Sapto Nisworo, Agung Trihasto |
|
71 - 80 of 82 Items |
<< < 6 7 8 9 > >> |